Thread regarding Verizon Communications Inc. layoffs

Gov. Josh Shapiro signs executive order placing guardrails on Pa. data centers

This could give Vz a huge leg up in PA.
AI/data center gets built ...needs connectivity ... Verizon sells connectivity ... Verizon has to build/maintain the network ...employees do the work.

For Verizon, potential work includes:

Fiber construction — new fiber routes into data centers.
Dark-fiber connections — lighting existing unused fiber or leasing strands.
Optical transport — installing/maintaining DWDM, ROADM and high-capacity equipment.
Central-office work — installing racks, shelves, power equipment, fiber panels and transport equipment.
Circuit provisioning — turning up high-capacity connections.
Testing — OTDR testing, fiber certification and optical testing.
Maintenance — troubleshooting fiber, optics, power and transmission equipment.
Network upgrades — increasing capacity as data-center traffic grows.
Data-center interconnects — connecting one data center to another over Verizon's network.
Enterprise services — businesses located at or around those facilities need dedicated connectivity.
Verizon has a lot of existing dark fiber in Pennsylvania, that's potentially a huge advantage. Verizon also has existing facilities .


by
| 1 view | | 4 replies (last 11 days ago) | Reply
Post ID: @OP+1m0b4g2nr

4 replies (most recent on top)

We need a "moratorium of understanding" to establish a balance between business and the environment.

by
| | Reply
Post ID: @dh+1m0b4g2nr

Bans and restrictions all over, stocks all tumbling. Circular investments. Ai bubble is popping

by
| | Reply
Post ID: @b5+1m0b4g2nr

@ab newsflash - the network you’ve been using for half a century, from POTS to cell phone to data to video, was built with unions and red tape. Jack@ss!

by
| | Reply
Post ID: @ap+1m0b4g2nr

Means nothing … bottom line no one will want to use a VZ Data Center anyway with unions and red tape.

by
| | Reply
Post ID: @ab+1m0b4g2nr